Molecular images of all entries in the PDB
Molecular images of all entries in the PDB
Result page: Previous < 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 > Next
The PDB entry link is to the RCSB PDB site. Below that, a link
to the BMRB entry is given for those PDB entries originating from NMR studies that
have NMR experimental data deposited with BMRB.
A version with yellow background exists here.
The image itself links to a larger version. Information on how to use this
resource to show a "Molecule of the Hour" on your windows desktop is given
here.
Please use these images as you please and reference the relevant papers:
-
Berman,H.M., Westbrook,J., Feng,Z., Gilliland,G., Bhat,T.N., Weissig,H., Shindyalov,I.N. and Bourne,P.E. (2000). The Protein Data Bank. Nucleic Acids Res. 28, 235-242.
-
Bernstein,F.C., Koetzle,T.F., Williams,G.J., Meyer,E.E., Jr., Brice,M.D., Rodgers,J.R., Kennard,O., Shimanouchi,T. and Tasumi,M. (1977). The Protein Data Bank: a computer-based archival file for macromolecular structures. J. Mol. Biol. 112, 535-542.
-
Doreleijers,J.F., Mading,S., Maziuk,D., Sojourner,K., Yin,L., Zhu,J., Markley,J.L. and Ulrich,E.L. (2003). BioMagResBank database with sets of experimental NMR constraints corresponding to the structures of over 1400 biomolecules deposited in the Protein Data Bank. J. Biomol. NMR 26, 139-146.
-
Koradi,R., Billeter,M. and Wuthrich,K. (1996). MOLMOL: a program for display and analysis of macromolecular structures. J. Mol. Graph. 14, 51-55.
-
Ulrich,E.L., Ioannidis,Y.E., Livny,M., Mading,S., Slatter,N.C. and Markley,J.L. (1998). BioMagResBank: A Resource Integrating Structure, Dynamics, and Chemistry. XVIIth International Conference on Magnetic Resonance in Biological Systems. Tokyo, Japan.
This overview was generated on: Mon Jun 8 11:17:48 2015